How long does a home or office renovation take?
A renovation runs through 6 stages: site inspection, design, approval, manufacturing, site work and handover. The length of each stage depends on the area, how much furniture is made to order and the building's working rules.By the ZAK Interior design team · Updated 30 October 2026

What happens in the first week?
The first week covers the site inspection, measurements and the brief. ZAK Interior records the existing condition and agrees which finishes stay and which are replaced.
Why does manufacturing set the schedule?
Wardrobes, kitchens and media walls are made to measure after the design is approved, so they set the critical path. Site work such as strip-out, ceilings and electrical runs in parallel while the workshop builds.
What can delay a renovation?
The most common delays are late design changes, imported materials and building restrictions.
- Changes after manufacturing starts
- Imported tiles, fittings or fabrics
- Plaza or society working-hour limits
- Hidden plumbing or wiring problems